Project 2.3.2 West Point Bridge Design

Project Manager: Me (Aviram Bhalla-Levine)
Project Members: Christopher Garduno, Lemar Popal, Sarang Vadali
Class: Principles of Engineering
Date: 14 March 2015
Summary: In this project, my team was challenged with the problem of people needing to cross a river without the use of boats, or projectile transport.We were to design and test a prototype for a bridge to solve this problem using the West Point Bridge Design software.
My Role: In this project, I was responsible for over half of the documentation, and I created the final design solution. I wrote the design brief, illustrating the constraints and necessities of this project. I also facilitated the decision matrix process, where my team member and I decide what bridge we would further pursue in our designs to develop a solution. As we modified the design we chose in the decision matrix, I kept a careful eye on the various stresses on the members of the bridge, along with the cost to maximize the efficiency of our "funds." Additionally, as Project Manager, I made sure everyone was on task.
What I learned: As a technical writer, I was able to expand on my skills in documentation in this project as I didn't experience much trouble actually prototyping the design and therefore had more time to document. As a project manager, I learned to lead when there is only one other person and was also able to help other teams that were having difficulty.
Images:

Our final solution to the project with annotation as to the workings of the bridge.

An image of one of the designs ultimately not chosen as the final solution.

This website was made with personalized Bootstrap by Aviram Bhalla-Levine,
and is hosted by GitHub's website service for this online engineering portfolio.